A TAREKS application is still pending while imported goods accumulate storage, demurrage and terminal charges in Turkey. Learn what importers can do to accelerate the process, document delay, challenge administrative inaction and protect compensation rights.
A shipment may arrive in Turkey on time, the importer may complete its commercial preparations, and the customs declaration may be ready—yet the goods can remain at the port or temporary storage facility because a TAREKS application has not been finalized.
Every additional day can create substantial costs.
Depending on the shipment, the importer may face storage charges, container demurrage, detention, terminal expenses, warehouse costs, production disruption and even customer claims.
The central question is therefore:
What can an importer do when the TAREKS process remains pending while costs continue to increase?
The importer should treat the problem as both a technical product-compliance procedure and a potential administrative-law dispute. The first priority is to identify exactly why the application remains pending, remove any correctable deficiency immediately, document every day of delay and protect formal legal remedies if the process becomes unjustifiably prolonged.
TAREKS is Turkey’s Risk-Based Trade Control System.
It is used in connection with product-safety and technical-regulation controls applicable to specified products in foreign trade.
Depending on the relevant product and import-control legislation, the system may involve:
Therefore, a pending TAREKS application does not always mean that the file is simply waiting for an officer.
The underlying stage must first be identified.
Common reasons include:
The legal strategy depends on the reason.
The importer should determine:
Has the application merely been submitted?
Has it been assigned for inspection?
Has additional documentation been requested?
Are the goods undergoing physical control?
Has a sample been taken?
Is laboratory analysis pending?
Is the authority waiting for information from the importer?
Without identifying the procedural stage, it is difficult to challenge delay effectively.
Before alleging administrative delay, review the file carefully.
A missing document or unanswered request can stop progress.
Check:
If Customs or the competent product-safety authority is waiting for the importer, the deficiency should be corrected immediately.
Incorrect tariff classification can cause the shipment to enter the wrong control process.
Confirm:
HS code
→ applicable product-safety regulation
→ relevant import-control communication
→ TAREKS requirement.
If the goods were incorrectly brought within a particular control regime, classification may become part of the legal challenge.
Do not assume that every product falling under a broad tariff heading is automatically subject to the same technical requirements.
Product scope may depend on:
A scope dispute can sometimes be more important than the pending application itself.
If the application has remained pending without an obvious explanation, the importer should request clarification through the appropriate official channel.
The request should identify:
The objective is to establish a documented administrative chronology.
Telephone communication may help operationally, but it provides weak evidence if a dispute later develops.
Important communications should be documented.
Record:
Date
Authority contacted
Issue raised
Response received
Action requested.
This chronology may later become important in an administrative challenge or damages claim.
If the authority requests further documents, submit them as quickly as reasonably possible.
Then preserve evidence showing:
This helps distinguish authority delay from importer delay.
Speed should not come at the expense of consistency.
Before submitting additional evidence, compare:
Contradictions can extend the review further.
The foreign manufacturer may control documents needed to complete the TAREKS review.
Request:
Do not wait until the authority issues repeated requests.
Where a sample is taken for laboratory examination, determine:
The importer should track the laboratory stage separately from the general TAREKS file.
For high-value disputes, preserve information concerning:
This becomes particularly important if the eventual laboratory result is disputed.
Do not wait until the TAREKS procedure ends.
Maintain a daily cost file containing:
The importer should be able to demonstrate exactly how the delay translated into financial loss.
These costs should not be grouped under one vague heading.
Charges for goods or containers remaining at the port, terminal or storage facility.
Typically relates to keeping the carrier’s container within the relevant terminal or agreed period beyond free time.
Typically concerns keeping carrier equipment outside the terminal beyond the agreed period.
Contractual terminology can vary, so the actual tariff and transport agreement should be reviewed.
For containerized imports, determine:
This allows the importer to quantify increasing exposure.
While the administrative process continues, contact:
Request commercially available:
These requests do not resolve the TAREKS problem, but they may reduce the loss.
If the company later seeks compensation, evidence that it attempted to minimize its losses can be important.
Retain:
Depending on the goods and procedural stage, the importer should investigate whether any lawful alternative customs or storage arrangement can reduce costs while the technical-control procedure continues.
This is highly transaction-specific.
Do not move, manipulate or place the goods under another procedure without confirming that the relevant customs and product-safety requirements permit it.
If the shipment contains:
necessary for production, document that fact.
A delay that threatens factory operations is commercially different from an ordinary inventory delay.
Preserve:
These records may become important if substantial damages arise.
If delayed clearance threatens customer contracts, preserve:
Do not attempt to reconstruct this evidence months later.
Where the file is complete and delay is creating rapidly increasing losses, the importer can consider submitting a reasoned request for prompt completion.
The request should be factual.
Explain:
A useful application does not need to accuse officials of wrongdoing.
The stronger approach is to establish:
complete file
Not every delay creates administrative liability.
Technical inspections require time.
Laboratory testing requires time.
Risk-based controls can legitimately delay release.
However, where a complete application remains unresolved for an excessive period without a legally sufficient explanation, administrative-law remedies may need to be examined.
Prepare a chronological table:
| Date | Event | Responsible Party | Result |
|---|---|---|---|
| Day 1 | TAREKS application | Importer | Submitted |
| Day 3 | Documents requested | Authority | Request |
| Day 3 | Documents supplied | Importer | Complete |
| Day 8 | Inspection | Authority | Completed |
| Day 20 | No decision | — | Pending |
This makes the dispute much easier to understand.
This distinction is essential in any later compensation argument.
If:
10 days resulted from missing importer documents
and
20 days resulted from unexplained administrative inactivity,
the two periods should not be treated identically.
Potentially.
The available remedy depends on:
The appropriate administrative and judicial route should therefore be determined from the specific file.
Then the dispute changes.
The importer may need to examine:
A pending-file strategy should therefore preserve evidence for a potential rejection dispute.
If rejection results from laboratory testing, do not analyze only the legal document.
Compare:
test method
technical standard
sample
product specification
manufacturer’s laboratory results
applicable regulation.
Technical expert input may be necessary.
Potentially, but not automatically.
A successful damages claim generally requires more than showing that storage costs were incurred while an administrative procedure was pending.
Questions can include:
Each case requires individual analysis.
A strong damages file should establish:
invoice
This creates a much clearer causal record.
Retain:
This allows the loss to be linked to the specific shipment.
If the company alleges that TAREKS delay caused lost sales or production losses, the evidence should be particularly strong.
Relevant evidence may include:
Speculative figures are weaker than documented losses.
Where administrative conduct causes serious and rapidly increasing harm, available judicial mechanisms should be assessed promptly.
Whether urgent relief is legally available depends on the challenged administrative measure, procedural posture and evidence.
Do not wait until the goods have accumulated months of costs before reviewing judicial options.
Distinguish:
Application still pending
from
Application rejected.
The legal remedies and procedural strategy may differ significantly.
TAREKS approval can affect customs clearance, but Customs and the technical-control authority perform different functions.
Determine exactly which authority is responsible for the current blockage.
An application directed to the wrong authority wastes valuable time.
The customs broker may hold:
Obtain a complete copy of the file.
Sometimes the TAREKS delay begins because the foreign supplier provided:
If so, the Turkish importer should review its contractual rights against the supplier.
The company may simultaneously face:
an administrative problem in Turkey
and
a contractual claim against the foreign manufacturer.
One should not necessarily wait for the other.
Where a prolonged customs or regulatory delay causes substantial storage or cargo-related losses, businesses may also review whether any relevant insurance policy potentially responds to part of the loss.
Coverage depends entirely on the policy wording and cause of loss.
When storage costs become extremely high, an importer may consider:
Before choosing such an option, calculate:
existing costs
future daily costs
goods value
re-export cost
contractual consequences
tax consequences.
A rushed decision can create additional losses.
For example:
Day 1: application tracking.
First unexplained delay: technical review.
Additional-document request: same-day response.
Material storage exposure: written escalation.
Continuing unexplained delay: legal review.
The exact timetable should reflect the goods and commercial risk.
Before shipping regulated goods to Turkey, verify:
Pre-shipment compliance is often much cheaper than solving the problem after containers arrive at the port.
If a TAREKS application remains pending while storage charges increase:
Identify the exact procedural stage
→ confirm product and HS classification
→ check whether any document is missing
→ respond immediately to requests
→ contact the foreign manufacturer
→ document every communication
→ record storage, demurrage and detention daily
→ request commercial mitigation from carriers and terminals
→ prepare a delay chronology
→ separate importer-caused and authority-caused delay
→ submit a reasoned request for prompt action where appropriate
→ preserve technical evidence
→ assess administrative remedies
→ protect compensation evidence
→ prepare for possible rejection or judicial challenge.
Determine the exact procedural stage and whether the authority is waiting for any document or action from the importer. A delay cannot be evaluated properly until this is known.
A reasoned request for prompt completion may be appropriate where the file is complete and continuing delay is causing substantial documented losses.
Potentially in appropriate circumstances, but the importer generally needs a strong evidentiary basis concerning the administrative conduct, actual loss, causation and its own contribution to the delay.
Track the sampling and laboratory process separately, preserve the sample information and obtain the technical documentation necessary to challenge an unfavorable result if one is issued.
Not automatically. However, the importer should immediately explore commercial mitigation with the carrier, terminal and relevant operators and examine whether any lawful alternative customs arrangement is available.
The importer should correct the regulatory file while simultaneously reviewing contractual remedies against the supplier for losses caused by inaccurate or incomplete documentation.
Potential administrative-law remedies may exist depending on the nature and duration of the inaction and the procedural stage. The specific file should be reviewed before selecting the remedy.
Yes. Storage, demurrage, detention and other terminal expenses can arise under different contractual arrangements and should be documented separately.
The application chronology, document submissions, authority communications, storage and carrier invoices, payment records, container information, mitigation attempts and evidence connecting the delay with the financial loss are particularly important.
Allowing the TAREKS application to remain passively pending while costs accumulate. The importer should simultaneously pursue the regulatory file, reduce commercial costs, document the delay and preserve administrative and contractual remedies.
TAREKS disputes can involve:
Pending TAREKS applications
Product-safety controls
Physical inspections
Laboratory delays
Technical-document disputes
Storage charges
Demurrage and detention
Production interruption
Administrative inaction
and compensation claims.
Fırat Fesih Kaya Law Office assists foreign manufacturers, international trading companies and Turkish importers when TAREKS procedures delay customs clearance and create substantial storage, demurrage or commercial losses.
Lawyer Fırat Fesih Kaya provides legal assistance in reviewing TAREKS files and technical-control procedures, documenting administrative delay, coordinating evidence with foreign manufacturers, challenging adverse administrative decisions, protecting urgent judicial remedies where available and evaluating compensation and supplier claims arising from prolonged import delays.
Phone: +90 312 434 22 22
Mobile: +90 532 769 22 22
Email: info@firatfesihkaya.av.tr
Address: Mevlana Boulevard No:221, Yıldırım Tower, Office No:148, 06520 Balgat, Çankaya, Ankara, Turkey