Construction materials stolen from your property in Turkey? Learn how foreign owners can file criminal complaints, investigate contractor theft, recover stolen materials and claim compensation under Turkish law in 2026.
Discovering that valuable construction materials have disappeared from a property development in Turkey can create serious financial and legal problems for foreign property owners, international investors, and individuals building residential or commercial real estate.
A foreign investor may purchase expensive construction materials for a villa, apartment building, renovation project, or commercial development, only to discover that steel, cement, electrical cables, plumbing equipment, insulation, machinery, or other supplies have been removed without authorization.
In some cases, the suspected theft may involve construction workers, subcontractors, site managers, security personnel, business partners, or individuals with access to the construction site.
A contractor may allegedly remove materials purchased with the investor’s money and use them at another development. A site manager may sell unused supplies without permission. A subcontractor may remove electrical cables, heating equipment, or other valuable materials after a payment dispute.
For foreign owners living outside Turkey, the problem can be especially difficult because they may rely on contractors and local representatives to supervise construction and protect the property.
Under Turkish law, unauthorized removal of construction materials may constitute theft, aggravated theft, abuse of trust, damage to property, or another criminal offense, depending on the circumstances.
However, not every disagreement concerning construction materials constitutes criminal theft. Ownership, possession, contractual arrangements, and the manner in which the materials were obtained must be examined.
A foreign property owner may pursue a criminal complaint while separately considering compensation, contractual remedies, evidence preservation, and recovery of stolen assets.
This guide explains the criminal remedies available when construction materials are stolen from a foreign-owned property in Turkey, including the applicable penalties, contractor liability, evidence requirements, and financial recovery options under the 2026 legal framework.
Theft is regulated under Article 141 of the Turkish Penal Code No. 5237.
The offense generally involves taking movable property belonging to another person from the place where it is held, without the possessor’s consent, with the intention of obtaining a benefit for oneself or another.
Construction materials may qualify as movable property for the purposes of theft law.
Examples include steel reinforcement bars, copper cables, timber, ceramic tiles, plumbing equipment, electrical components, windows, doors, insulation materials, and machinery.
A foreign investor may purchase these materials for a construction project and arrange for delivery to the site.
If another person unlawfully removes them with the required criminal intent, the conduct may constitute theft.
However, the legal analysis depends on the materials’ ownership and possession.
For example, a contractor may purchase materials in its own name under an agreement requiring delivery of a completed building.
In such circumstances, the investor’s payment of construction installments does not necessarily establish direct ownership of every material stored on the site.
The contract, invoices, delivery records, and allocation of property rights must therefore be examined.
Under Article 141 of the Turkish Penal Code, the basic theft offense carries imprisonment of one to three years.
More serious penalties may apply where the circumstances satisfy an aggravated theft provision under Article 142.
Construction site theft may involve circumstances requiring examination under aggravated theft rules, particularly where materials were stored in a secured location, taken from a building or its attachments, or involved categories of property specifically protected by the statute.
However, the fact that materials were stolen from a construction site does not automatically establish aggravated theft.
The prosecution must identify the applicable qualifying circumstance and prove its statutory elements.
The value of the materials, the method of removal, the location, and the conduct of the suspected individuals may all become relevant.
Additional offenses may arise where the perpetrators damage property, forge documents, or use threats or violence.
The criminal classification must be determined according to the evidence rather than the owner’s description of the incident alone.
Article 142 of the Turkish Penal Code regulates several aggravated forms of theft.
Depending on the circumstances, aggravated theft may involve property protected within buildings or their attachments, certain categories of secured property, or other specifically defined situations.
For example, removing materials from a locked construction storage area may require a different legal assessment from taking unsecured supplies left in an open location.
The method of entry and any damage to locks, gates, or storage facilities may also become relevant.
Where electrical cables or other components have already been installed as part of a building, the investigation may need to determine whether the conduct constitutes theft, damage to property, or multiple offenses.
The precise classification depends on the nature of the items and how they were removed.
The prosecution must establish the statutory requirements for aggravated theft.
Foreign property owners should therefore preserve evidence concerning where the materials were stored and how access was obtained.
A contractor may have lawful access to materials purchased for a construction project.
However, lawful access does not necessarily provide unlimited authority to remove, sell, or use those materials for unrelated purposes.
For example, a foreign investor may purchase steel and electrical equipment directly from suppliers and arrange for delivery to a construction site.
If the contractor knowingly removes those materials and sells them without authorization, criminal liability may arise.
The applicable offense depends on the contractual relationship and the nature of possession.
Where the contractor unlawfully takes property from another person’s possession, theft provisions may become relevant.
Where the materials were lawfully entrusted to the contractor for a specific purpose and subsequently misappropriated, abuse of trust under Article 155 may be more appropriate.
The distinction is important because theft and abuse of trust have different legal elements.
A contractor’s failure to account for materials does not automatically prove either offense.
The investigation must establish what happened to the materials and whether the relevant criminal intent existed.
Construction disputes frequently involve uncertainty about whether missing materials were stolen or misappropriated after lawful delivery.
Article 155 of the Turkish Penal Code regulates abuse of trust.
The offense concerns certain situations in which property has been entrusted to a person for safekeeping or use in a specified manner, but the person subsequently acts contrary to the purpose of the transfer or denies the relevant transfer.
For example, a foreign property owner may entrust expensive construction equipment to a site manager for use exclusively at a particular project.
If the manager deliberately sells the equipment for personal benefit, abuse of trust may require examination.
Where the relevant statutory conditions are satisfied, more serious rules may apply to abuse of trust committed in connection with professional, commercial, or service relationships.
By contrast, a person who never possessed the materials lawfully and secretly removes them may fall within theft provisions.
The legal classification depends on the original transfer of possession, the parties’ agreement, and the accused person’s conduct.
A construction site manager may be responsible for receiving deliveries, supervising inventory, and controlling access to supplies.
If the manager knowingly sells materials belonging to the owner without authorization, criminal liability may arise.
The investigation may examine whether the manager had lawful possession, whether the materials were entrusted for a specific purpose, and whether the sale exceeded the manager’s authority.
Invoices, delivery notes, inventory records, banking transactions, and communications with purchasers may provide important evidence.
A manager may claim that the materials were surplus, defective, or authorized for disposal.
Such explanations must be evaluated against the contract and the available records.
The mere absence of materials from the site does not automatically establish the manager’s criminal responsibility.
Subcontractors may have access to construction materials while performing electrical, plumbing, roofing, structural, or finishing work.
A dispute may arise when a subcontractor removes materials after a disagreement over payment.
For example, an electrical subcontractor may remove copper cables or installed equipment after claiming that the main contractor failed to pay outstanding invoices.
The legal analysis must distinguish between ownership of the materials, contractual rights, and unauthorized removal.
An unpaid subcontractor does not automatically acquire the right to take property belonging to another person.
However, the existence of a genuine ownership dispute or other legally relevant circumstances may affect the criminal assessment.
The prosecution must establish the elements of the alleged offense.
Separate civil proceedings may be necessary to resolve unpaid invoices, ownership disputes, and contractual obligations.
Construction workers may have access to valuable materials during ordinary site operations.
If a worker intentionally removes materials without consent and with the required criminal intent, theft provisions may apply.
Where several individuals participate, the rules concerning criminal participation may require examination.
However, employment at the site does not automatically establish responsibility for missing materials.
The investigation must identify the individuals involved and establish their conduct.
Security footage, access records, witness statements, delivery documents, and inventory discrepancies may assist.
A foreign owner should avoid publicly accusing specific workers without reliable evidence.
The appropriate criminal complaint may describe the suspected offense and identify known facts while leaving disputed questions for investigation.
A foreign owner who discovers suspected construction material theft may submit a criminal complaint to the competent Chief Public Prosecutor’s Office or report the incident through legally recognized law enforcement channels.
The complaint should identify the construction site, describe the missing materials, explain the circumstances of their disappearance, and provide available evidence.
The owner should identify the materials as precisely as possible, including their type, quantity, purchase value, and delivery date.
Where possible, the complaint should include invoices, delivery notes, inventory records, photographs, surveillance footage, and correspondence with contractors or site personnel.
If the owner suspects that materials were transferred to another construction site, that information may be relevant to the investigation.
The prosecutor may request evidence, obtain witness statements, examine relevant records, and direct appropriate investigative measures.
Foreign owners may appoint a Turkish lawyer to assist with the complaint and subsequent proceedings.
A criminal complaint does not automatically establish ownership of the materials or guarantee their recovery.
Evidence is often the decisive issue in construction material theft investigations.
A foreign owner should establish that the relevant materials existed, were delivered to the project, and were removed or otherwise disposed of without lawful authority.
Purchase invoices and supplier records may help establish the origin and value of the materials.
Delivery notes may demonstrate that the items arrived at the construction site.
Inventory records may identify discrepancies between the materials received and those remaining.
Photographs and videos may show the materials before their disappearance.
Security camera footage may reveal who entered the site and whether materials were removed.
Communications with contractors, site managers, and suppliers may help establish who controlled the materials.
Banking records may become relevant where the suspected perpetrator allegedly sold the supplies.
However, an inventory discrepancy alone does not automatically establish criminal theft.
Materials may have been legitimately installed, consumed, transferred, returned, or disposed of under the contract.
The investigation must examine these possibilities.
A foreign property owner may suspect that stolen materials have been transported to another construction project.
Where legally sufficient grounds exist, investigators may seek evidence through the applicable criminal procedure mechanisms.
The Criminal Procedure Code No. 5271 regulates searches, seizure, and other investigative measures.
The relevant procedural requirements depend on the location, evidence, and circumstances.
Police do not automatically possess unrestricted authority to search another person’s property merely because the complainant suspects that stolen materials are present.
Judicial or other legally authorized decisions may be required.
The owner should provide investigators with reliable information concerning the suspected location of the materials.
Private attempts to enter another construction site or recover property by force may create additional legal risks.
Where stolen materials are identified and lawfully seized, their return may be possible under the applicable criminal procedure rules.
The Criminal Procedure Code contains provisions concerning the return of seized property where the statutory conditions are satisfied.
The authorities may need to determine whether the materials remain necessary as evidence and whether ownership or entitlement is sufficiently established.
Where several parties claim ownership, the dispute may require additional examination.
Materials that have already been installed in another building may create more complicated property law issues.
Likewise, materials that have been sold, consumed, or destroyed may no longer be physically recoverable.
In such circumstances, financial compensation or other civil remedies may become important.
A foreign property owner who suffers financial loss through unlawful conduct may have a compensation claim under the Turkish Code of Obligations No. 6098.
Article 49 establishes the general framework for tort-based liability.
The claimant must establish the applicable legal requirements, including unlawful conduct, damage, causation, and fault.
Where the theft or misappropriation occurred within a contractual relationship, contractual liability may also require examination.
Potential losses may include the value of the missing materials and other legally recoverable damage.
For example, the theft may delay construction and cause additional expenses.
However, not every claimed delay or financial consequence is automatically recoverable.
The owner must establish the relevant loss and causal relationship.
The court may require technical or financial evidence concerning the value of the materials and the consequences of their disappearance.
The disappearance of essential construction materials may interrupt work and delay completion.
For example, theft of steel reinforcement, electrical cables, or specialized equipment may require replacement purchases and additional construction time.
Where the applicable legal requirements are satisfied, the owner may seek compensation for recoverable losses caused by the wrongful conduct.
Relevant evidence may include the construction schedule, replacement invoices, contractor correspondence, revised completion estimates, and financial records.
However, the claimant must distinguish delays caused by the theft from delays arising from unrelated construction problems.
The existence of stolen materials does not automatically establish that every subsequent project delay resulted from the offense.
The court may require expert examination to determine causation and the amount of recoverable damage.
Ownership disputes are common in construction projects.
A contractor may claim that materials purchased for the project belong to the construction company until installation or completion of the work.
The foreign investor may argue that the materials were purchased directly with the investor’s funds and delivered for the investor’s exclusive use.
The legal position depends on the contract, purchase documentation, delivery arrangements, and applicable property law principles.
Payment alone does not always establish ownership of particular movable goods.
Similarly, possession by the contractor does not necessarily establish ownership.
Where the dispute concerns genuine contractual rights, civil litigation may be required.
Criminal responsibility should not be inferred solely from the existence of conflicting ownership claims.
However, a fabricated ownership explanation may become relevant where the evidence demonstrates deliberate misappropriation.
<WritingBlock id=”94927″ variant=”document”>## What If Stolen Construction Materials Were Sold to a Third Party?
A person who unlawfully removes construction materials may subsequently sell them to a supplier, recycling company, subcontractor, or another construction business.
The legal consequences depend on the circumstances of the original removal and the subsequent transaction.
Where a third party knowingly acquires property obtained through a criminal offense, Article 165 of the Turkish Penal Code concerning the acquisition or acceptance of property obtained through crime may become relevant.
However, purchasing materials that later turn out to have been stolen does not automatically establish criminal responsibility.
The buyer’s knowledge and conduct must be examined.
The original owner may also need to consider the applicable civil property law rules concerning recovery of movable goods.
The legal position may differ depending on whether the materials were stolen, voluntarily entrusted to another person, or acquired by a third party under circumstances protected by law.
Where the materials have been incorporated into another building, physical recovery may become particularly complicated.
Construction projects may be covered by insurance policies addressing specified risks, including theft of materials or equipment.
The availability of coverage depends on the policy terms, insured property, exclusions, security requirements, and circumstances of the incident.
A construction all-risks policy may provide coverage for certain theft-related losses, but not every disappearance or misappropriation is necessarily insured.
Policies may distinguish between theft by outsiders, employee dishonesty, unexplained shortages, and losses involving entrusted property.
The owner should examine the insurance contract and applicable notification requirements.
Where an insurer denies coverage, the policy wording and reasons for rejection may require legal examination.
An insurance claim does not prevent a criminal complaint where the facts indicate a criminal offense.
However, insurance payments and compensation recovered from responsible parties must be considered under the applicable rules to avoid double recovery.
Where construction materials disappear during a project, the construction company’s contractual responsibilities may require examination.
The contractor may have undertaken to supervise the site, maintain inventories, provide security, or safeguard materials supplied by the owner.
If the company breaches a contractual obligation and causes recoverable damage, contractual liability may arise.
Article 112 of the Turkish Code of Obligations governs important aspects of liability for nonperformance.
The legal analysis should examine whether the contractor assumed responsibility for the relevant materials and whether the loss resulted from a breach.
However, a construction company does not automatically become liable for every theft committed by an unknown third party.
The contract, allocation of risk, security arrangements, and circumstances of the incident are important.
The investor may have contractual remedies even where no individual employee is convicted of theft.
A construction site may be protected by a private security company responsible for monitoring entrances, recording visitors, and preventing unauthorized access.
Where valuable materials disappear, the property owner may question whether the security provider fulfilled its contractual obligations.
The availability of compensation depends on the security agreement, the provider’s duties, the circumstances of the loss, and the applicable liability rules.
A security company does not automatically guarantee that no theft will occur.
However, failure to perform legally relevant contractual duties may create liability where the applicable requirements are established.
The owner should preserve security contracts, incident reports, access logs, and communications concerning the missing materials.
Where a security employee knowingly participates in theft, individual criminal responsibility may also require examination.
The theft of construction materials may create consequences beyond the immediate value of the missing items.
A project may experience delays, increased financing costs, replacement expenses, or contractual disputes with buyers and subcontractors.
Where the stolen materials are essential to structural work, the project may be unable to proceed until replacements are obtained.
The foreign investor may also face contractual obligations toward purchasers or tenants who expected delivery by a specified date.
These consequences should be assessed separately from the criminal investigation.
A criminal conviction does not automatically resolve construction delay claims or establish every financial loss suffered by the investor.
The appropriate legal strategy may require criminal proceedings, contractual claims, insurance notifications, and compensation litigation.
As of November 2026, construction material theft disputes are primarily governed by the Turkish Penal Code No. 5237, the Criminal Procedure Code No. 5271, the Turkish Code of Obligations No. 6098, and relevant property and procedural legislation.
Article 141 of the Turkish Penal Code establishes the basic theft offense, while Article 142 regulates aggravated theft. Article 155 addresses abuse of trust where property has been lawfully entrusted to another person and subsequently misappropriated under the statutory conditions.
The distinction between these offenses is particularly important in construction disputes because contractors, site managers, and subcontractors may lawfully possess or control materials before the alleged misconduct occurs.
Under Article 142, certain aggravated theft circumstances carry substantially higher penalties than basic theft. The applicable penalty depends on the specific qualifying provision and the circumstances established by the prosecution. <Cite ref=”turn220848search9″/>
Article 155 must be considered in its current statutory form, including amendments introduced by Law No. 7571 in December 2025.
The amendment introduced an additional provision concerning offenses involving motor vehicles, watercraft, and aircraft.
This change does not automatically increase penalties for ordinary construction materials such as cement, steel, timber, or electrical cables.
Nevertheless, it demonstrates the importance of distinguishing the subject matter of an alleged offense and applying the relevant statutory provision.
For construction materials entrusted through professional or commercial relationships, Article 155(2) may be particularly important. That provision carries imprisonment of one to seven years and a judicial fine of up to three thousand days where its conditions are established. <Cite ref=”turn220848search6″/>
Foreign owners should also distinguish between criminal penalties and financial compensation.
The Criminal Procedure Code governs criminal investigations, while the Turkish Code of Obligations provides important rules concerning civil liability.
A criminal complaint does not automatically suspend contractual limitation periods or guarantee repayment.
The applicable statutory wording, procedural requirements, and effective dates should be examined in every active dispute.
A foreign property owner who discovers missing construction materials should promptly establish what was purchased, what was delivered, and what remains at the construction site.
The owner should preserve purchase invoices, delivery documents, inventory records, photographs, and available security footage.
Where the materials were stored in a locked area, evidence concerning access and security arrangements may be particularly important.
The owner should also identify the individuals who had authority to receive, move, install, or dispose of the materials.
A written inventory comparison may help determine whether the discrepancy resulted from theft, authorized use, or another cause.
Where criminal conduct is suspected, the owner may submit a complaint to the competent prosecution authorities.
If the materials may still be identifiable, prompt investigation may improve the prospects of locating them.
Civil claims, insurance notifications, and contractual remedies should be considered independently.
Foreign owners who reside outside Turkey may generally authorize a Turkish lawyer to assist with criminal complaints and related proceedings.
The power of attorney must satisfy the applicable formal requirements.
Depending on the country and procedure, authorization may be executed through a Turkish consulate or another legally recognized method.
Translation, apostille certification, or legalization may be necessary.
A lawyer may assist with preparing the complaint, obtaining documents, identifying relevant evidence, and pursuing appropriate civil remedies.
However, certain investigative or judicial procedures may require the owner’s personal participation.
Foreign investors should preserve original documents and monitor legally significant notifications.
Lawyer Fırat Fesih Kaya emphasizes that construction material theft disputes involving foreign investors often require careful examination of ownership, possession, contractual responsibilities, and the actual circumstances of the alleged removal.
A legally effective approach should distinguish between criminal theft, abuse of trust, contractual nonperformance, and ordinary inventory discrepancies.
A criminal investigation seeks to determine whether an identified person committed theft, abuse of trust, or another offense.
Civil proceedings may address the owner’s financial losses and the responsibility of contractors, employees, security providers, or other parties.
These proceedings have different objectives and legal requirements.
A criminal conviction does not automatically result in full compensation for the stolen materials or construction delays.
Likewise, contractual liability may arise even where the evidence does not establish a criminal offense.
Foreign property owners should therefore consider criminal proceedings and civil recovery options together.
Where the materials remain identifiable, recovery of the property itself may be relevant.
Where the materials have been sold, consumed, or destroyed, financial compensation may become the principal remedy.
1. Can I file a criminal complaint if construction materials are stolen from my property in Turkey?
Yes. Where the circumstances indicate theft, abuse of trust, or another criminal offense, a foreign property owner may submit a complaint to the competent prosecution authorities. The complaint should include available evidence concerning ownership, delivery, disappearance, and suspected unlawful conduct.
2. What is the punishment for stealing construction materials in Turkey?
Basic theft under Article 141 of the Turkish Penal Code carries imprisonment of one to three years. Aggravated theft under Article 142 may involve higher penalties where the statutory qualifying circumstances are established.
3. Can a contractor be prosecuted for taking materials purchased with my money?
Potentially. The legal classification depends on ownership, possession, contractual authority, and the contractor’s conduct. Theft or abuse of trust may be relevant where the statutory elements are established. Payment by the investor alone does not automatically resolve ownership.
4. Is it theft if a subcontractor removes materials because the contractor has not paid them?
Unauthorized removal may constitute a criminal offense depending on the circumstances. However, the legal analysis must examine ownership, possession, the claimed debt, and any applicable statutory provisions. An unpaid invoice does not automatically authorize taking another person’s property.
5. Can stolen construction materials be recovered through a criminal investigation?
Potentially. Where the materials are located and lawfully seized, their return may be possible under the applicable criminal procedure rules. Recovery may be more complicated if the materials have been sold, installed, consumed, or destroyed.
6. Can I claim compensation for stolen materials and construction delays?
Compensation may be available where the applicable legal requirements are satisfied. The owner must establish the relevant financial loss and its causal connection to the wrongful conduct. Contractual liability may also be relevant.
7. Can a foreign property owner file a construction material theft complaint without travelling to Turkey?
In many circumstances, a foreign owner may appoint a Turkish lawyer to assist with the criminal complaint and related civil proceedings. The authorization must satisfy applicable requirements, and personal participation may still be necessary for certain procedural acts.
8. Is a construction company responsible if its employees steal materials?
Potential civil liability depends on the applicable legal framework, employment relationship, contractual duties, and circumstances of the theft. Individual criminal responsibility must be assessed separately. A company is not automatically criminally responsible for every act committed by an employee.
9. Can insurance cover construction materials stolen from a building site?
Coverage depends on the policy terms, insured risks, exclusions, and circumstances of the loss. Certain construction insurance policies may cover qualifying theft-related damage, but unexplained shortages or dishonest acts by entrusted persons may be treated differently.
10. How long does a construction material theft investigation take in Turkey?
There is no universal duration. The investigation may depend on witness testimony, inventory records, security footage, banking evidence, the number of suspects, and whether the missing materials can be located.
Protecting your property investment requires timely and specialized legal assistance.
Foreign property owners who discover that construction materials, equipment, or valuable supplies have disappeared from their building projects may face financial losses, construction delays, contractual disputes, and difficulties recovering their property.
Working with a lawyer experienced in Turkish criminal law, construction law, real estate disputes, and compensation proceedings can help protect your legal rights and identify the appropriate remedies.
Serving clients throughout Turkey and internationally, Fırat Fesih Kaya Law Office provides professional legal support in construction material theft investigations, criminal complaints against suspected perpetrators, contractor misappropriation disputes, abuse of trust allegations, stolen property recovery, construction-related compensation claims, and contractual disputes involving missing materials.
Lawyer Fırat Fesih Kaya assists foreign property owners, international investors, developers, expatriates, and individuals residing abroad who have suffered financial losses arising from suspected theft or misappropriation of construction materials in Turkey.
Call Now: +90 312 434 22 22
WhatsApp: +90 532 769 22 22
Email: info@firatfesihkaya.av.tr
Website: https://www.firatfesihkaya.av.tr
Disclaimer: This article is intended for general informational purposes only. To avoid any loss of legal rights, we recommend consulting your lawyer regarding the specific circumstances of your case.