Discover the legal remedies available for construction defects in solar and wind energy projects in Turkey. This 2026 legal guide explains EPC contractor liability, hidden defects, warranty claims, expert reports, compensation, EMRA compliance, and dispute resolution for foreign investors.
Turkey has become one of the leading renewable energy markets in Europe, attracting billions of dollars in foreign investment in solar power plants (GES), wind farms (RES), battery energy storage systems (BESS), hybrid renewable energy projects, and utility-scale electricity generation facilities. While these projects offer long-term investment opportunities, construction defects remain one of the most common causes of disputes between project owners, EPC contractors, equipment manufacturers, insurers, and lenders.
Construction defects may reduce electricity production, delay the Commercial Operation Date (COD), increase maintenance costs, invalidate equipment warranties, trigger EMRA investigations, and significantly reduce the value of the investment. In serious cases, defects may require partial reconstruction of the project or complete replacement of critical equipment.
Foreign investors are not without protection. Turkish law provides several legal remedies against contractors, designers, consultants, suppliers, and other responsible parties, provided that claims are pursued correctly and within the applicable contractual and statutory time limits.
Construction disputes involving renewable energy projects in Turkey are generally governed by:
This 2026 Updated Legal Guide explains the legal remedies available when construction defects are discovered in Turkish solar and wind energy projects.
A construction defect is a failure of the completed works to comply with:
Defects may appear immediately after completion or several years after commercial operation.
Defects may result in:
Large renewable projects may suffer substantial financial losses if defects are not identified and corrected promptly.
Frequently encountered problems include:
These defects often reduce system efficiency and long-term reliability.
Typical issues include:
Many of these issues require specialist engineering analysis.
Construction defects often originate during the design phase.
Examples include:
Design consultants may be liable where defects result from professional negligence or contractual breach.
Liability may arise where:
Material defects may affect both contractor liability and manufacturer warranty rights.
Examples include:
Workmanship defects frequently become apparent during commissioning or the first years of operation.
If the completed project does not satisfy contractual specifications regarding:
the project owner may have contractual remedies against the EPC contractor.
Latent defects are defects that:
These claims often require independent expert investigations and careful evidence preservation.
Visible defects generally include:
Such defects should normally be documented during inspections and acceptance procedures.
Acceptance testing should verify:
Acceptance certificates should not be signed without resolving significant outstanding defects.
The contractor may be liable where the facility fails to achieve:
These claims often coexist with construction defect claims.
The project owner should review:
Failure to follow maintenance procedures may affect warranty coverage.
Depending on the contract, the EPC contractor may be responsible for:
Liability limitations should be reviewed carefully.
Project consultants may also be liable for:
Professional indemnity insurance should also be examined.
Equipment suppliers may be responsible for:
Supply contracts should be analyzed separately from the EPC Contract.
Potential insurance coverage may include:
Early notification to insurers is essential.
Technical disputes almost always require:
Expert evidence frequently determines the outcome of litigation or arbitration.
Developers should preserve:
Comprehensive documentation strengthens future legal claims.
Construction defects may affect:
Developers should ensure that remediation plans remain consistent with EMRA obligations.
Foreign investors may seek compensation for:
Recoverable losses depend on the contract and Turkish law.
Many EPC Contracts contain:
These provisions should be reviewed before initiating proceedings.
Construction defect disputes are commonly resolved through:
International renewable energy projects frequently favor arbitration because of confidentiality and enforceability.
Foreign investors frequently:
These mistakes may significantly reduce recoverable compensation.
When construction defects are discovered:
Early legal and technical intervention substantially improves the likelihood of a successful outcome.
Construction defect disputes require expertise in:
An experienced Turkish energy lawyer can:
Professional legal support helps foreign investors protect the long-term value and performance of renewable energy assets.
A construction defect is any deficiency in design, workmanship, materials, installation, or performance that causes the completed project to fail to meet contractual specifications, applicable legislation, technical standards, or accepted engineering practices.
Yes. Foreign investors may seek compensation where defects result from contractual breaches, negligent design, defective workmanship, defective materials, or other legally actionable conduct, subject to the relevant contract terms and Turkish law.
A patent defect is visible or reasonably discoverable during inspection or acceptance. A latent defect is hidden and becomes apparent only after completion or during operation.
Not necessarily. Depending on the circumstances, liability may also rest with designers, consultants, equipment manufacturers, suppliers, subcontractors, or multiple parties simultaneously.
Yes. Many EPC Contracts and manufacturer warranties provide repair or replacement rights for defective equipment, provided that warranty procedures and maintenance requirements have been followed.
Absolutely. Independent engineering experts play a critical role in identifying the cause of defects, determining responsibility, estimating repair costs, and providing evidence in arbitration or court proceedings.
Yes. Large international renewable energy projects frequently include ICC, ISTAC, LCIA, or other arbitration clauses because arbitration offers confidentiality, specialist decision-makers, and internationally enforceable awards.
A Turkish energy lawyer can evaluate contractual remedies, preserve evidence, coordinate technical experts, enforce warranty rights, pursue compensation claims, ensure compliance with EMRA requirements, negotiate settlements, and represent investors in arbitration or litigation arising from construction defects.
Construction defects can significantly reduce the value and profitability of renewable energy investments. Prompt legal action, combined with technical investigation and effective contract enforcement, is essential to protect investor rights and secure appropriate compensation.
Fırat Fesih Kaya and our legal team advise foreign investors, renewable energy developers, infrastructure funds, EPC contractors, multinational corporations, project sponsors, lenders, and institutional investors on construction defect claims, EPC Contracts, warranty disputes, EMRA compliance, renewable energy investments, engineering contracts, international arbitration, and all aspects of Turkish energy and commercial law.
24/7 Emergency Phone: +90 532 769 22 22
Office Phone: +90 312 434 22 22
Email: info@firatfesihkaya.av.tr
Address: Mevlana Boulevard No:221, Yıldırım Tower, Office No:148, 06520 Balgat, Çankaya, Ankara, Turkey