

Learn how foreign property owners can challenge a risky building report in Turkey, including the 15-day objection period, technical committee review, administrative litigation, suspension of execution and technical evidence.
A foreign property owner does not have to accept a risky building determination without examining whether the assessment was technically and procedurally correct. Depending on the stage of the process, the owner may have access to an administrative objection, technical review and judicial remedies.
Timing is critical.
Under the current procedure, a building owner or legal representative may object to the risky building determination within 15 days from the final day of the relevant local announcement. The objection is submitted to the competent Urban Transformation Directorate or, where authority has been delegated, the relevant administration.
Foreign owners should pay particular attention to this rule because living outside the country does not automatically prevent the statutory notification process from progressing.
For Lawyer Fırat Fesih Kaya, the correct strategy begins by separating three questions: whether the 15-day technical objection remains available, whether judicial review should be considered, and whether urgent interim protection is necessary before evacuation or demolition creates irreversible consequences.
Do not challenge the assessment based only on what a neighbor, building manager or contractor has told you.
Obtain the actual risky building assessment report.
Current rules require risky building reports to pass through the prescribed electronic system and administrative review. Reports are examined according to the applicable procedures, and deficiencies can be returned to the institution or organization that prepared the report for correction. If no deficiency is identified, the risky building is reported to the relevant title authority and the statutory notification process begins.
The complete report is essential because the strongest challenge is normally directed at identifiable technical or procedural problems rather than general opposition to redevelopment.
The first deadline to investigate is the statutory technical objection period.
The current procedure provides that information concerning the risky building determination is posted on the building, owners are informed electronically, and the determination is announced at the relevant local administrative office for fifteen days.
The risky building determination is deemed notified on the final day of that local announcement.
From that date, owners or their legal representatives have 15 days to object.
This means that the date on which the foreign owner personally learns about the report may not be the legally decisive date.
Suppose a foreign owner lives abroad and receives a message from a neighbor stating:
“Your building was declared risky three weeks ago.”
The owner should not automatically assume that the 15-day objection period starts on the day that message was received.
The official chronology must be reconstructed.
The important information includes when the statutory local announcement began, when it ended and whether the risky building determination has already become final.
Foreign owners should therefore obtain official notification records immediately.
Yes, appropriate legal representation may be used.
The current procedure expressly recognizes objections made by building owners or their legal representatives.
For a foreign owner who cannot travel within a short deadline, representation can be particularly important.
However, the power of attorney should be carefully drafted. Authority to obtain the risky building report, submit an objection and pursue related legal proceedings does not automatically require unrestricted authority to sell the property, transfer land shares or sign a redevelopment agreement.
The objection is submitted to the competent Urban Transformation Directorate or, where authority has been delegated, the relevant administration for the location of the building.
The owner should preserve evidence of timely submission.
The applicant’s ownership or representative status should also be properly documented.
A foreign owner should not wait until the final day to resolve representation or document problems.
A risky building objection should normally address the technical or procedural validity of the determination.
Simply saying:
“I do not want my apartment demolished.”
“I disagree with the other owners.”
“The contractor is unreliable.”
“The property is valuable.”
“The building looks safe.”
may not establish that the risky building assessment itself is incorrect.
The question at this stage is whether the building was properly determined to be risky according to the applicable technical and administrative framework.
The answer depends on the actual report.
Potential issues may involve the identification of the building, structural information, technical methodology, calculations, testing, material data or compliance with the applicable technical assessment principles.
The current regulation also requires the report to identify the building through the prescribed address and building information.
An objection should therefore identify real problems in the particular assessment rather than rely on generic allegations.
Where the dispute is technical, independent engineering review can be extremely important.
A legal review can identify deadlines, notification defects, procedural irregularities and available remedies. An engineering review can evaluate structural methodology, calculations and other technical components of the assessment.
These two forms of review should complement each other.
A foreign owner who simply commissions another engineer to say “the building is safe,” however, should not assume that this automatically removes the official risky building determination.
The statutory status must be challenged through the legally recognized procedure.
The objection is examined by a technical committee.
Current official guidance provides that the committee includes academic members and technical personnel and examines whether the risky building report complies with the applicable technical assessment principles.
This is important because the objection is not decided by the contractor, the building manager or the owner who originally requested the assessment.
It is a formal technical review.
No.
Current official guidance expressly states that the technical committee is not limited to the particular objection ground stated in the petition.
The committee examines the risky building assessment report technically as a whole and determines whether it was prepared in accordance with the applicable principles. It then reaches the final technical conclusion as to whether the structure is risky or not.
This can be important where review reveals a technical problem that the owner did not identify precisely in the initial objection.
If the result of the risky building assessment changes following the objection, the changed status is communicated to the relevant title authority. The current implementing regulation expressly recognizes changes resulting from both objections and judicial decisions.
A successful objection can therefore alter the official legal status of the property.
Owners should subsequently verify that the administrative and title records correctly reflect the changed result.
If the objection is rejected, the risky building determination becomes final.
The determination also becomes final if no timely objection is submitted.
This is a major procedural turning point.
The owner must then consider whether judicial review is appropriate while simultaneously preparing for the possibility of evacuation, demolition and redevelopment.
Potentially, yes.
An administrative action affecting a foreign-owned property is not immune from judicial review merely because the owner is a foreign citizen.
The precise action to challenge, competent court, defendant administration and filing deadline must be determined from the actual administrative file.
This distinction is important because the risky building determination, evacuation and demolition measures, and later redevelopment-related administrative procedures are not necessarily the same legal act.
A court petition should therefore identify precisely which administrative measure is being challenged.
Disputes challenging administrative measures concerning risky building procedures fall within the administrative judicial system.
Danıştay case law confirms the role of administrative courts in disputes arising from implementation of Law No. 6306. It also reflects the rule that disputes involving immovable property are generally connected to the administrative court for the location of the property.
The exact court and procedural route should nevertheless be determined from the particular case rather than assumed from a generic example.
Yes, technical evidence can become central to the judicial dispute.
This is particularly significant because the competent authority has developed a system through which court-appointed experts can, when requested, access electronic risky building assessment information, documents and building photographs relating to structures involved in litigation under Law No. 6306.
The official 2026 guidance specifically describes access by court-appointed experts to risky building report details through the relevant electronic information system for purposes of examination, calculation and preparation of expert reports.
This illustrates why preservation and examination of the technical file can be decisive in risky building litigation.
Not automatically.
A private engineering report can identify technical problems and help formulate the challenge, but the court evaluates the administrative action within the complete evidentiary and legal framework.
The private report should therefore contain substantive technical analysis rather than merely state that the owner disagrees with the official conclusion.
The stronger question is not:
“Can I find another engineer who says the building is safe?”
It is:
“Can the technical basis of the official risky building determination withstand independent and judicial scrutiny?”
Yes, where judicial review results in a decision affecting the determination.
The current implementing regulation expressly states that where the result of the risky building assessment changes following a judicial decision, the relevant title authority is notified.
Judicial review can therefore have direct consequences for the official status of the building.
This should be distinguished from merely filing a lawsuit.
A pending lawsuit and a judgment altering the administrative decision are not the same thing.
No automatic assumption should be made that filing the lawsuit itself freezes the process.
This is one of the most important practical points for foreign property owners.
If implementation must be stopped while judicial proceedings continue, the availability and requirements of interim judicial protection must be examined separately.
A property owner should therefore never tell tenants or other owners:
“The lawsuit has been filed, so demolition cannot happen.”
The actual judicial orders in force must be checked.
Suspension of execution is an interim judicial mechanism that may become relevant where implementation of the disputed administrative action needs to be prevented while the court considers the case.
Whether the legal conditions are satisfied depends on the particular dispute.
It is particularly significant in risky building cases because demolition is a physical and potentially irreversible act.
If the building is demolished while litigation is continuing, a later favorable judgment cannot physically reconstruct the former building.
Timing can determine the practical value of litigation.
A Danıştay decision concerning a risky building dispute records a situation in which the building had already been demolished before the judicial process could produce a practically effective technical reconsideration of the risky building report.
This illustrates the danger of treating litigation as if it automatically freezes the physical process.
Where demolition is approaching, the litigation strategy should address urgency from the beginning.
Missing the ordinary technical objection deadline is serious.
The current implementing regulation provides that objections submitted outside the statutory period are not processed through the ordinary objection mechanism.
However, a foreign owner should not automatically conclude either that every remedy has disappeared or that a lawsuit can always be filed later without limitation.
The complete administrative chronology must be examined.
Notification, subsequent administrative measures and judicial filing periods may all become relevant.
Being abroad does not automatically restart the ordinary statutory objection period.
The current notification procedure does not depend exclusively on physical delivery to the owner’s overseas address.
The assessment is posted on the building, communicated electronically and announced through the prescribed local procedure, with notification deemed completed on the final day of that local announcement.
If the owner believes the notification process was defective, the correct approach is to obtain and examine the official notification records.
Potentially, notification defects can be legally significant because notification affects the owner’s ability to use statutory remedies.
The important question is whether the legally prescribed notification procedure was followed.
A foreign owner should obtain evidence concerning the building posting, electronic notification and local announcement.
Simply stating that no paper letter arrived abroad is not enough to establish that the statutory notification was defective.
A genuine error concerning the identity of the assessed structure can be highly significant.
The current regulatory framework requires identifying information concerning the assessed building to appear in the report.
The owner should compare the assessment with the title record, parcel information, building information and physical property.
Any discrepancy should be documented precisely.
Allegations that a report was prepared contrary to reality require serious evidence.
The current regulation expressly recognizes the situation where a risky building report has been determined to have been prepared contrary to reality as one of the exceptions to the general rule limiting the number of reports for the same structure.
If the owner has evidence of fabricated testing, incorrect structural information or another serious irregularity, that evidence should be preserved and evaluated technically and legally.
Unsupported accusations are not a substitute for evidence.
Generally, no.
The current implementing regulation provides that only one risky building assessment report may normally be prepared for each structure.
Specific exceptions exist, including where a new report is required following an objection or judicial decision, where the original report is found to have been prepared contrary to reality, or where a concrete event other than deliberate interference affects the building’s risk condition.
Therefore, commissioning repeated statutory reports until one produces the desired result is not the ordinary legal remedy.
The owner who originally requested the assessment should not assume that changing their mind automatically eliminates the official risky building determination.
Once the report enters the statutory administrative process, its status is determined by the applicable legal framework.
Private agreement among owners or withdrawal of commercial interest in redevelopment does not establish that the technical assessment was wrong.
If the report is disputed, the appropriate objection or judicial remedy should be used.
Unanimous agreement among owners does not replace the statutory technical process.
Owners cannot eliminate an official risky building determination simply by signing a private document stating that they believe the building is safe.
The classification is based on the statutory assessment and review framework.
Conversely, a valid technical challenge can succeed even if most other owners prefer demolition and reconstruction.
If no timely objection is made or the objection is rejected, the risky building determination becomes final. The administration then proceeds to the evacuation and demolition stage.
The current implementing framework provides that owners may be given a period of up to 90 days for evacuation and demolition.
At this stage, the foreign owner should protect both immediate occupancy interests and the underlying property position.
A legal challenge may succeed, but it may also fail.
Do not wait for the final outcome before checking the property records.
Obtain an up-to-date title record.
Verify the registered land share.
Check mortgages, attachments, usufruct rights and other restrictions.
The land share can become extremely important if the building is ultimately demolished and the owners move into the redevelopment stage.
Before demolition becomes possible, document the property comprehensively.
Take photographs and videos.
Record the floor, orientation, internal layout, balconies, parking, storage and other valuable characteristics.
For commercial property, preserve evidence of frontage, entrance position, visibility and other features affecting commercial value.
Keep available architectural plans and ownership documentation.
Once the building is physically demolished, reconstructing this evidence can become much more difficult.
A foreign owner may dislike the contractor selected by other owners.
That does not necessarily mean that the risky building assessment is incorrect.
Likewise, the building may genuinely be risky while the proposed redevelopment contract is commercially unacceptable.
These are separate legal issues.
The first concerns the validity of the technical and administrative risky building determination.
The second concerns the future redevelopment project and private contractual rights.
A legal strategy should identify which problem actually needs to be solved.
A contractor may tell a foreign owner:
“The building has already been declared risky, so you have no choice but to sign.”
That statement oversimplifies the legal position.
Even where the risky building determination becomes final, the owner should still examine the redevelopment proposal carefully.
The agreement should clearly address the replacement unit, floor, orientation, net and gross area, land share, parking, storage, construction specifications, completion date, temporary rent, delay consequences, guarantees, title transfers and contractor default.
Challenging the risky building report and negotiating the redevelopment agreement are different matters.
The foreign owner should continue monitoring owner meetings and subsequent notices.
Do not assume that filing an objection or lawsuit means that all other procedures have automatically stopped.
The practical effect depends on the stage of the risky building process and any administrative or judicial decision affecting implementation.
If other owners begin contractor selection or redevelopment decision-making, obtain the meeting records and proposed agreements.
Yes, the owner should examine their individual right to use the available remedies even if every other owner supports redevelopment.
The technical validity of the risky building determination is not decided by popular vote.
An owner may have a genuine technical challenge even when the other owners prefer a new building.
Conversely, being the only owner opposing demolition does not itself prove that the assessment is wrong.
The technical and legal evidence controls the dispute.
The owner should obtain the complete risky building assessment report, title record, documents identifying the assessment institution, administrative review information, building and parcel information, statutory notification records, local announcement dates, any administrative objection, technical committee decision and any evacuation or demolition documentation already issued.
Where litigation is being considered, independent engineering analysis and relevant court documents should also be preserved.
If redevelopment negotiations have started, obtain owner-meeting records and contractor agreements separately.
The first priority is verification. Confirm that there is an official risky building determination and obtain the complete report.
The second priority is deadline control. Establish the final day of the relevant local announcement. The ordinary technical objection period is 15 days from that date.
The third priority is technical analysis. Determine whether there is a genuine engineering basis for challenging the report.
The fourth priority is administrative objection. Where the statutory period remains open, submit the objection to the competent authority and preserve proof of timely filing.
The fifth priority is technical committee review. Remember that the committee reviews the report technically as a whole rather than merely deciding whether it agrees with the wording of the owner’s petition.
The sixth priority is judicial review. If the risky building determination remains in force and there are grounds for litigation, identify the exact administrative action, court, defendant administration and judicial deadline.
The seventh priority is interim protection. If demolition is approaching, determine whether suspension of execution should be requested. Do not assume that filing a lawsuit automatically stops implementation.
The eighth priority is property protection. Verify the title deed and land share and preserve detailed evidence of the existing property before any demolition.
For foreign owners, the most important rule is:
Do not challenge a risky building report merely by refusing to cooperate. Challenge it through the technical and judicial procedures available under the law, and act before the relevant deadlines or physical demolition make effective protection significantly more difficult.
Yes. Foreign ownership does not itself prevent an affected property owner from using the available objection and judicial mechanisms.
Under the current ordinary procedure, owners or their legal representatives have 15 days from the final day of the relevant local announcement.
Yes. An appropriately authorized legal representative can act where the applicable representation requirements are satisfied.
A statutory technical committee reviews the risky building report technically and determines whether the structure is risky.
Judicial review may be available depending on the particular administrative action, procedural stage and applicable filing requirements.
No automatic assumption should be made that filing the lawsuit alone stops implementation. Interim judicial protection must be considered separately where necessary.
Yes. Current official 2026 guidance provides an electronic mechanism through which court-appointed experts can request access to detailed risky building assessment information and related documents for structures involved in litigation under Law No. 6306.
Normally only one risky building assessment report is permitted for a structure, subject to specific exceptions such as a new report required after an objection or judicial decision or a report found to have been prepared contrary to reality.
Once the risky building determination becomes final, the process can proceed toward evacuation and demolition. The current framework permits a period of up to 90 days for those steps.
Obtain the official report, verify the notification chronology, calculate the 15-day objection deadline, arrange technical review where appropriate, preserve your administrative remedies and evaluate judicial and interim protection before demolition becomes imminent.
A risky building report can affect not only the physical building but also the owner’s long-term property position. For a foreign homeowner, delay is particularly dangerous because official notification and objection periods may progress while the owner is outside the country.
The critical issues are the 15-day objection deadline, technical validity of the assessment, technical committee proceedings, administrative litigation, suspension of execution, notification while living abroad and protection of the property before demolition.
Fırat Fesih Kaya Law Office provides legal assistance to foreign homeowners and property investors dealing with risky building assessments and urban transformation disputes.
Lawyer Fırat Fesih Kaya assists foreign clients with reviewing risky building reports, calculating objection deadlines, preparing technical objections, coordinating independent engineering review, evaluating administrative court proceedings, assessing suspension-of-execution requests, examining notification irregularities and protecting title and redevelopment rights throughout the urban transformation process.
Phone: +90 312 434 22 22
WhatsApp: +90 532 769 22 22
Email: info@firatfesihkaya.av.tr