Learn the essential legal checklist for Operation & Maintenance (O&M) Agreements in Turkey. This 2026 guide explains key clauses for power plants, including solar (GES), wind (RES), hydro (HES), geothermal (JES), battery storage (BESS), performance guarantees, EMRA compliance, liability, insurance, and dispute resolution.
After a power plant has been successfully constructed and commissioned, its long-term profitability depends on efficient operation and proper maintenance. While Engineering, Procurement and Construction (EPC) Contracts govern the construction phase, Operation & Maintenance (O&M) Agreements regulate the operational life of the facility, which may extend for 20 to 30 years.
For foreign investors, infrastructure funds, independent power producers (IPPs), utilities, and multinational energy companies investing in solar power plants (GES), wind farms (RES), hydroelectric power plants (HES), geothermal facilities (JES), battery energy storage systems (BESS), natural gas power plants, biomass facilities, hydrogen projects, and electric vehicle charging infrastructure, a properly negotiated O&M Agreement is essential to preserve asset value, maximize electricity production, and ensure regulatory compliance.
An inadequate O&M Agreement may result in:
Turkish O&M Agreements are primarily governed by:
This 2026 Updated Legal Guide explains the essential legal clauses every foreign investor should include in an Operation & Maintenance Agreement for power plants in Turkey.
An O&M Agreement is a long-term contract under which the operator undertakes responsibility for:
The agreement defines operational responsibilities after Commercial Operation Date (COD).
A properly drafted agreement helps:
O&M Agreements are commonly used for:
The agreement should clearly define:
Unclear service descriptions frequently result in disputes.
The operator should comply with measurable Key Performance Indicators (KPIs), including:
Performance standards should be objective and verifiable.
Many O&M Agreements guarantee:
Failure to achieve guaranteed availability may trigger financial remedies.
The agreement should include:
Preventive maintenance significantly reduces unexpected failures.
Clearly define:
Emergency repair obligations should also be specified.
The contract should regulate:
Supply-chain planning is particularly important for imported equipment.
Modern renewable facilities rely on:
The agreement should allocate responsibility for digital monitoring systems.
The operator should ensure compliance with:
Grid non-compliance may lead to financial penalties or regulatory action.
The O&M provider should assist with:
Failure to comply may expose the project owner to administrative sanctions.
The agreement should allocate responsibility for:
Environmental obligations should remain consistent with applicable permits.
The operator should maintain:
Compliance with Turkish occupational safety legislation is essential.
The agreement should specify:
Personnel shortages may affect plant performance.
Regular reports should include:
Monthly reporting is standard practice.
Common pricing models include:
Compensation should align with measurable performance.
Bonuses may be linked to:
Well-designed incentives align the interests of the parties.
The agreement may provide for:
Penalty provisions should remain commercially reasonable.
The O&M provider should preserve:
Improper maintenance may invalidate warranty protection.
The agreement should allocate responsibility for:
Insurance obligations should align with financing documents.
Clearly define:
Risk allocation should reflect the commercial value of the project.
The contract should specify:
Force Majeure provisions should remain consistent with EPC and financing documents.
The agreement should address:
Regulatory costs should be allocated clearly.
Modern power plants require:
Cybersecurity clauses are increasingly important for renewable energy facilities.
The contract should regulate:
Assignment provisions should remain consistent with project finance documents.
Termination provisions should cover:
The agreement should also regulate handover procedures.
International investors frequently choose:
The governing law and seat of arbitration should also be specified.
Foreign investors frequently:
These mistakes often reduce project efficiency and increase operational costs.
Before executing an O&M Agreement:
A carefully negotiated O&M Agreement significantly improves the long-term performance and value of the project.
Negotiating an O&M Agreement requires expertise in:
An experienced Turkish energy lawyer can:
Early legal planning minimizes operational risks while ensuring compliance with Turkish energy legislation.
An Operation & Maintenance Agreement is a contract governing the operation, inspection, maintenance, repair, and technical management of a power plant after construction has been completed and commercial operation has commenced.
Although Turkish law does not generally require every power plant owner to enter into a separate O&M Agreement, such agreements are standard practice for utility-scale energy projects because they help ensure regulatory compliance, operational efficiency, and lender confidence.
Common KPIs include plant availability, response times, forced outage rates, maintenance completion rates, production efficiency, and compliance with scheduled maintenance programs.
The agreement should clearly allocate operational compliance responsibilities, including technical reporting, inspections, and assistance with regulatory obligations. However, the ultimate legal responsibility toward the authorities often remains with the license holder unless otherwise provided by law.
Availability guarantees directly affect electricity production and project revenue. Failure to meet agreed availability levels may result in performance deductions, liquidated damages, or other contractual remedies.
Yes. Warranty obligations, performance guarantees, maintenance responsibilities, spare parts provisions, and technical standards should be fully aligned with the EPC Contract to avoid contractual conflicts and preserve manufacturer warranties.
Yes. Many agreements include incentive mechanisms rewarding the operator for achieving higher availability, increased production, improved efficiency, or reduced downtime, provided that the performance criteria are objectively measurable.
A Turkish energy lawyer can draft and negotiate O&M Agreements, ensure consistency with EPC Contracts and project finance documents, allocate operational and regulatory risks, protect warranty rights, ensure compliance with Turkish energy legislation and EMRA requirements, and represent investors in arbitration or litigation arising from operational disputes.
A well-drafted Operation & Maintenance Agreement is essential for maximizing the long-term value of a power plant. Clearly defined operational responsibilities, measurable performance standards, and balanced risk allocation help protect revenue, preserve equipment, and reduce the likelihood of costly disputes.
Fırat Fesih Kaya and our legal team advise foreign investors, renewable energy developers, infrastructure funds, independent power producers, EPC contractors, multinational corporations, lenders, and institutional investors on Operation & Maintenance Agreements, EMRA compliance, project finance, renewable energy investments, EPC Contracts, international arbitration, and all aspects of Turkish energy and commercial law.